Skip to content

Construction ID:

Floor Finishes: Carpet, tiles, timber, laminates, synthetics.

Construction Height:

 85–95¹

mm

Mass:

 110–140¹

kg / m²

Thermal Resistance (R-value):

0.86

m² K / W

Uniform Distributed Load (UDL):

2.0

kN / m²

Point Load (≥ 20 cm²):

1.0

kN

Impact Sound Reduction:

≥28²

dB

¹ Excludes floor finish.
² Valid on concrete floors >120 mm (DIN EN 4109: > 276 kg / m²).

Area of Application:

  • Floors with rooms of equal temperature above and below, and a minimum R-value of 0.75 m² K / W.
  • This construction is suitable for use on intermediate floors, and no further insulation is needed to meet the Part L requirements.

Additional Information:

  • Services such as flow and return pipes can be run within primary insulation and back-filled with loose-fill levelling compound.
  • 85 mm Construction Height includes 55 mm liquid screed on reduced 30 mm insulation (at least 35 mm coverage over pipework).
  • 95 mm Construction Height includes at least 65 mm sand cement screed on typical 75 mm insulation (at least 45 mm coverage over pipework). For additional floor loading requirements (such as 3 kN / m²) increase by a further 15 mm anhydrite or 20 mm sand cement.
  • Strict heating up protocol applies with all in-screed systems.

Floor Finishes:

Carpet, tiles, timber, laminates, synthetics.

Construction Height:

 85–95¹ mm

Mass:

 110–140¹ kg / m²

Thermal Resistance (R-value):

0.86 m² K / W

Uniform Distributed Load (UDL):

2.0 kN / m²

Point Load (≥ 20 cm²):

≥28² kN

Impact Sound Reduction:

≥28² dB

¹ Excludes floor finish.
² Valid on concrete floors >120 mm (DIN EN 4109: > 276 kg / m²).

Area of Application:

  • Floors with rooms of equal temperature above and below, and a minimum R-value of 0.75 m² K / W.
  • This construction is suitable for use on intermediate floors, and no further insulation is needed to meet the Part L requirements.

Additional Information:

  • Services such as flow and return pipes can be run within primary insulation and back-filled with loose-fill levelling compound.
  • 85 mm Construction Height includes 55 mm liquid screed on reduced 30 mm insulation (at least 35 mm coverage over pipework).
  • 95 mm Construction Height includes at least 65 mm sand cement screed on typical 75 mm insulation (at least 45 mm coverage over pipework). For additional floor loading requirements (such as 3 kN / m²) increase by a further 15 mm anhydrite or 20 mm sand cement.
  • Strict heating up protocol applies with all in-screed systems.