St. Mary’s Church, Leatherhead

#075

JUPITER were awarded this project as it was proven that the cost of installing a traditional limecrete-embedded underfloor heating system exceeded our dry-installed alternative. This was in large part a result of cost savings achieved by reducing the depth of excavation required. Time was also a factor: downtime at the Church had to be kept to an absolute minimum and JUPITER achieved this through removing the lengthy drying out time associated with limecrete.