In 2008 architects Woods Bagot were confronted with the problem of levelling all the existing floors at the Grosvenor House Hotel without introducing heavy, wet levelling screeds. JUPITER were approached to install our dry floor levelling slate to all 150 bathrooms throughout the complex. JUPITER were instructed to provide a fall within the floor to the wet rooms in addition to underfloor heating throughout. Our Screed Replacement Tile system was used to provide a stable substrate, simplifying the installation of the enormous marble slab finish.