Skip to content

Gassiot House, St. Thomas’ Hospital

#027

In collaboration with ME Construction and facing a particularly tight programme, JUPITER were tasked with providing an underfloor heating system for the new outpatient centre at St Thomas’ Hospital, capable of accepting the high floor loads required by BS6399.