A case study in collaboration with Gabriel Chipperfield of GC Office.

8th December 2016

This project made use of our Jupiter IDEAL EPS Between Joist system with the Screed Replacement Tile (SRT) in Bathrooms and Fermacell in the rest of the property.  The combination of these two Load Bearing Surfaces kept the final floor level the same throughout the building eliminating any unsightly steps. 


For more detail see our case study for this project: Marylebone Townhouse 


 The large format marble floor slabs seen above are laid onto the SRT with a full bed of flexible adhesive.  Thanks to the SRT system Jupiter is able to guarantee any stone or tile floor finish against failure.



 This timber finish was installed onto the Fermacell Load Bearing Surface providing a firm feeling underfoot.


 Underfloor heated bathroom. 

It's always a pleasure to work with the team at GC Office to create a space like this.

For more infomation about our systems and installations get in contact.

49MaryleboneTownhouse-EPSBJ,SRT,2E11.pdf


More news stories

Sign up for our newsletter

Get the latest Jupiter news by email



Why choose Jupiter?

We love to work very closely with all our clients, all our systems are guaranteed and we're experts at providing tailored solutions.

Want to speak to someone?

We know it may be easier to talk to one of us directly about your requirements.